Zeichnungsnummer / Drawingsno
Last modified by Florian Hillen on 2026/07/03 09:14
Drawing Numbers Numbering scheme:
- same Drawing No for Part and Drawing
- weldments are always assemblies
- assemblies have different drawing no than parts
- style like: BT000223-01 where -01 is Revison code
- Revision starting at -00
- BT = for Bauteile ( Parts )
- BG = Baugruppen / Assemblies
- BG does not differentiate between Weldment and non Weldment
Once a part get put into ERP it gets an indepent ERP No
ERP No style is like:
- BT-01-123456
- same struture with BT and BG and NT (catalogue part) and EL (eletrical part)
- not every Drawings gets an ERP No. for Example a submetal sheet of a weldment has a drawing no. but not an ERP no.
- once we can sell or buy a part / assembly / weldment we are giving an ERP no
Revisions
if a part is revisionized the drawing get revisionized as well
if a drawings revisioniezd the part gets revisionized as well => we want that they stay in sync
ToDo: Explanation about chainging revisions in Weldments / Assemblies