Wiki source code of Zeichnungsnummer / Drawingsno

Last modified by Florian Hillen on 2026/07/03 09:14

Show last authors
1 Drawing Numbers Numbering scheme:
2
3 * same Drawing No for Part and Drawing
4 * weldments are always assemblies
5 * assemblies have different drawing no than parts
6 * style like: BT000223-01 where -01 is Revison code
7 * Revision starting at -00
8 * BT = for Bauteile ( Parts )
9 * BG = Baugruppen / Assemblies
10 * BG does not differentiate between Weldment and non Weldment
11
12 Once a part get put into ERP it gets an indepent ERP No
13
14
15
16 ERP No style is like:
17
18 * BT-01-123456
19 * same struture with BT and BG and NT (catalogue part) and EL (eletrical part)
20 * not every Drawings gets an ERP No. for Example a submetal sheet of a weldment has a drawing no. but not an ERP no.
21 * once we can sell or buy a part / assembly / weldment we are giving an ERP no
22
23
24
25 Revisions
26
27 if a part is revisionized the drawing get revisionized as well
28
29 if a drawings revisioniezd the part gets revisionized as well => we want that they stay in sync
30
31 ToDo: Explanation about chainging revisions in Weldments / Assemblies